Old South Ferry subway station reopens Thursday - FOX 10 News | myfoxphoenix.com

Superstorm Sandy

Old South Ferry subway station reopens

Posted: Updated:
NEW YORK (MYFOXNY) -

The MTA has refurbished an old, unused subway station to serve the No. 1 train while the Sandy-devastated South Ferry station is rebuilt.

The old South Ferry station, which was shuttered in 2009 when the new one was opened, reopens Thursday, April 4, 2013.

Superstorm Sandy pushed 15 million gallons of water into the new South Ferry station, filling it the track level to the mezzanine and destroying all electrical and mechanical systems, the MTA said.

Crews will likely need about two years to rebuild that station.

In the interim, the MTA will run No. 1 trains to the old South Ferry loop station, which actually sits above the damaged station.

That old station can only accommodate 5 subway cars at a time, whereas most trains run 10 cars. The platform at that station is curved, which means its moveable platform extenders, which bridge gaps between the platform and the cars, needed to be refurbished with new pistons and other components, the MTA said.

Workers also installed electrical feeds, lighting on the platforms and in the tracks, and repaired and repainted station walls.

  • TrafficMore>>

  • Could airlines create a class just for children?

    Could airlines create a class just for children?

    Monday, July 28 2014 12:37 PM EDT2014-07-28 16:37:57 GMT
    Imagine a segregated airline flight: one section for children and one section for adults only. This is the vision of entrepreneur Richard Branson, the president of Virgin Atlantic.
    Imagine a segregated airline flight: one section for children and one section for adults only. This is the vision of entrepreneur Richard Branson, the president of Virgin Atlantic.
  • Bridge closed after its rammed by runaway barge

    Bridge closed after its rammed by runaway barge

    A stretch of a major southern New Jersey roadway was closed for several hours after a runaway barge rammed into a bridge.
    A stretch of a major southern New Jersey roadway was closed for several hours after a runaway barge rammed into a bridge.
  • G subway line shutting down for 5 weeks

    G subway line shutting down for 5 weeks

    Friday, July 25 2014 9:37 PM EDT2014-07-26 01:37:26 GMT
    Beginning Friday night, a portion of the G subway line that connects Brooklyn and Queens will be shut down for five weeks.
    The MTA says there will be no service between the Nassau Avenue station in Greenpoint and Court Square in Long Island City until Sept. 2.
    Beginning Friday night, a portion of the G subway line that connects Brooklyn and Queens will be shut down for five weeks.
    The MTA says there will be no service between the Nassau Avenue station in Greenpoint and Court Square in Long Island City until Sept. 2.
Powered by WorldNow

KSAZ-TV & KUTP
511 W. Adams St.
Phoenix, AZ 85003

Phone: (602) 257-1234
Fax: (602) 262-0177

Didn't find what you were looking for?
All content © Copyright 2000 - 2014 Fox Television Stations, Inc. and Worldnow. All Rights Reserved.
Privacy Policy | Terms of Service | Ad Choices