New Safety Concerns Over PECO Meter Installations

New Safety Concerns Over PECO Meter Installations

Posted: Updated:
  • New Safety Concerns Over PECO Meter Installations

  • Thursday, September 13 2012 1:42 PM EDT2012-09-13 17:42:09 GMT
    It was a fire in a Bucks County home two weeks ago, and other issues related to PECO's smart meter program, which have drawn Pennsylvania's Public Utility Commission into PECO's smart meter controversy.
    It was a fire in a Bucks County home two weeks ago, and other issues related to PECO's smart meter program, which have drawn Pennsylvania's Public Utility Commission into PECO's smart meter controversy.
  • Thursday, September 13 2012 1:41 PM EDT2012-09-13 17:41:55 GMT
    Only On FOX: There was a major announcement from the region's energy giant after a FOX 29 Investigation. PECO is shutting down a massive, federally-funded energy program.
    Only On FOX: There was a major announcement from the region's energy giant after a FOX 29 Investigation. PECO is shutting down a massive, federally-funded energy program.
  • Thursday, September 13 2012 1:41 PM EDT2012-09-13 17:41:14 GMT
    It's been just two days since regional energy giant PECO abruptly halted its federally funded smart meter installation program, yet the utility has already received 1,000 calls from customers.
    It's been just two days since regional energy giant PECO abruptly halted its federally funded smart meter installation program, yet the utility has already received 1,000 calls from customers.
  • Thursday, September 13 2012 1:33 PM EDT2012-09-13 17:33:52 GMT
    If you want your PECO meter or equipment inspected, officials there want you to give them a call. The number is 1-855-741-9011.
    If you want your PECO meter or equipment inspected, officials there want you to give them a call.


    The number is 1-855-741-9011.
  • Tapping in to a PECO electric meter is a dangerous and sometimes deadly practice.
    Tapping in to a PECO electric meter is a dangerous and sometimes deadly practice.

PECO'S multi-million dollar smart meter program shut down last week following fire and safety concerns.

Now, as the energy giant re-evaluates the program, a new safety issue is being raised - are some workers required to meet installation quotas?

"This is shocking to me."

PECO spokesperson Cathy Engel Menendez was taken aback when Fox 29 showed her a notice that seems to indicate that smart meter installers for a PECO sub-contractor must meet a performance quota, or be disciplined.

A so-called "Constructive Counseling Notice" was given to Fox 29 Investigates Jeff Cole last week by a worker who claims he was suspended for not installing enough meters. The employee works for Grid One Solutions, a company sub-contracting with PECO to install thousands of the new meters.

The notice, written about two weeks ago, states that the employee will be "required to meet and exceed his 30 meter quota," and "failure to do so will result in further disciplinary action."

Last week, following a Fox 29 investigation and two recent fires in Buck's County, PECO suspended the federally funded program over growing concerns that the installation of the digital meters could spark fires.

PECO says there have been 15 overheating incidents since they began installing the meters last year. To date, 186,000 meters have been installed. PECO says nine of the incidents were the result of existing electrical conditions. Six are still under investigation.

Engel Menendez says Grid One has told PECO that it does not impose a quota system. Menendez believes if installers must meet performance goals, safety could be an issue.

"It's just frankly against the paramount focus of safety," Menendez says. "It is unequivocally not the way PECO conducts itself."

"The guys are driven pretty hard."

Scott Cummings of northeast Philadelphia says he worked for Grid One Solutions for about two years. He says smart meter installations have involved electrical arcs, flashes and fires. He says he also knows about performance quotas.

"We have guys that could put in 50 or 60 per day and they were the golden boys," Cummings says. "We had guys that put in 18 and we were told to manage them to production and get rid of them."

 "Our bottom line is to keep people safe," Menendez emphasizes. "And if that's something that would not keep people safe, we want to put a stop to it."

 Late Tuesday afternoon, Fox 29 received an email from Grid One.

It states that "an employee goal" was incorrectly referred to as a "quota" as part of an individual employee's performance counseling. The email says that Grid One has an "employee performance goal of 30 meter installations per day" based on past experience with similar installations."

 

 

  • PECO Smart Meters

  • Thursday, September 13 2012 1:42 PM EDT2012-09-13 17:42:09 GMT
    It was a fire in a Bucks County home two weeks ago, and other issues related to PECO's smart meter program, which have drawn Pennsylvania's Public Utility Commission into PECO's smart meter controversy.
    It was a fire in a Bucks County home two weeks ago, and other issues related to PECO's smart meter program, which have drawn Pennsylvania's Public Utility Commission into PECO's smart meter controversy.
  • Thursday, September 13 2012 1:41 PM EDT2012-09-13 17:41:55 GMT
    Only On FOX: There was a major announcement from the region's energy giant after a FOX 29 Investigation. PECO is shutting down a massive, federally-funded energy program.
    Only On FOX: There was a major announcement from the region's energy giant after a FOX 29 Investigation. PECO is shutting down a massive, federally-funded energy program.
  • Thursday, September 13 2012 1:41 PM EDT2012-09-13 17:41:39 GMT
    PECO'S multi-million dollar smart meter program shut down last week following fire and safety concerns. Now, as the energy giant re-evaluates the program, a new safety issue is being raised - are some
    PECO'S multi-million dollar smart meter program shut down last week following fire and safety concerns. Now, as the energy giant re-evaluates the program, a new safety issue is being raised.
  • Local News

  • Friday, May 24 2013 10:26 PM EDT2013-05-25 02:26:18 GMT
    Philadelphia Police are looking for a man that sexually assaulted a teenage girl in Germantown.Police say the incident happened just before 11P.M. on May 19th on the 6000 block of Wister Street.The suspect
    Philadelphia Police are looking for a man that sexually assaulted a teenage girl in Germantown.
  • Friday, May 24 2013 10:01 PM EDT2013-05-25 02:01:49 GMT
    Kasey's bark may be worse than her bite. But Hamilton Township Police say the crook who tried to rob Draper Ellis late Thursday afternoon at his "May's Landing Auto Parts Store" didn't stick around
    A South New Jersey business owner comes face to face with a suspected robber threatening him with a knife. Thanks to his 7-year-old family pet, the crook ran off.
  • Friday, May 24 2013 7:08 PM EDT2013-05-24 23:08:04 GMT
    Busy planning your cook-out or trip down the shore this Memorial Day Weekend? Don't forget about the men and women for whom the holiday is observed.
    Busy planning your cook-out or trip down the shore this Memorial Day Weekend? Don't forget about the men and women for whom the holiday is observed. FOX 29's Bruce Gordon spent a day with folks preparing a veterans' cemetery for its day in the spotlight.
Powered by WorldNow

KSAZ-TV & KUTP
511 W. Adams St.
Phoenix, AZ 85003

Phone: (602) 257-1234
Fax: (602) 262-0177

Didn't find what you were looking for?
All content © Copyright 2000 - 2013 Fox Television Stations, Inc. and Worldnow. All Rights Reserved.
Privacy Policy | Terms of Service | Ad Choices